Hidden Creek Community Center

Hillsboro Parks & Recreation

The Hidden Creek Community Center will create a new civic recreation campus situated in the heart of Hillsboro’s growing community. The new multi-generational community center is designed to integrate harmoniously into a new 20-acre community park with an adjoining second-growth forest.

Size: 51,000 sf
Location: Hillsboro, OR
Completion: Fall 2020
Stat: Path to Net Zero

Constructed with tilt-up concrete walls and cross-laminated timber (CLT), this will be the nation’s first mass timber community center with a post and beam frame supporting CLT floor and roof planes. The building’s cruciform plan reinforces visual and physical connections from the entry plaza and community spaces to the park and recreation spaces with the forest. This linkage is reinforced through transparency, courtyards and an outer skin of bark-colored metal panels and inner layer of spruce CLT that blends into the stand of trees.

The innovative green design and light-filled architecture brings together social, recreation and cultural spaces that are inclusive and accessible to the community. Spaces include a two-court gymnasium, cardio and weight rooms, two exercise/dance rooms and a 300-seat divisible community room.

With a large solar array on the roof of the community wing, natural ventilation, water conservation measures, and balanced daylighting, the Community Center is enrolled in the path to net-zero program and expected to achieve net-zero energy use at opening.

The $37 million facility was planned and designed through an active public engagement process that consisted of input from an 18-person Citizen Advisory Committee, public open house events and a statistically valid survey as well as a web-based survey. The Community Center is currently under construction with an anticipated opening in the fall of 2020.