Albertsons Stadium North End Zone

Boise State University

At the core of this transformative Design-Build project is a mission to elevate the game-day experience for Boise State University Broncos fans and student-athletes alike. Our approach for the North End Zone expansion at Albertsons Stadium embodies the University’s spirit and its unique connection to the city, Boise River Greenbelt and the Boise Mountains framed by the Bitterroot Range to the north.

 

Size: 92,255 sf
Location: Boise, ID
Design-Build: Andersen Construction | Opsis | HOK | Gilbane

The expansion creates an energetic atmosphere that brings fans closer to the action by completing the stadium seating bowl with diverse seating options, improving circulation and expanding concession stands.

The new premium seating experience features 12 field-level suites, 44 loge boxes, 148 ledge seats and 882 club seats.

Premium seat holders enjoy exclusive access to amenities such as the field-level club and “club lite” and a front-row view of the pregame player tunnel, offering a level of immersion never seen in the Boise State game-day experience.

For the athletes who inspire us, the project delivers a best-in-class student-athlete dining hall that also serves as a game-day club room. The dining hall and nutrition zone caters to nutritional needs with precision, ensuring student-athletes have access to meals tailored to their rigorous training programs.

The Andersen/Opsis Design-Build team, with support from national experts at HOK and Gilbane, developed a delivery strategy that balanced speed, excellence and accessibility. This plan created uninterrupted access throughout construction while fast-tracking project delivery to bring this vision to life as quickly as possible.