The Phase 1B of the Starr SFG was a Logistics Study of the Ross Complex focused originally on the “multi-nodal” logistics approach outlined in the Ross SFP. Multiple warehousing options and layouts were developed which included expansion of the existing warehouse facility. The review of a possible second logistics node revealed that a new multi-nodal logistic approach would create unneeded complexities and require staffing levels beyond the current capacity of BPA. With this understanding the focused shifted to this Revised Phase 1B study for a “satellite storage” distribution concept where limited amounts of slow moving and system critical material and equipment inventory at Ross is relocated to a new, “satellite storage” and warehousing facility in a less seismically vulnerable and more centrally located site within the BPA service area. This scaled back approach illuminates the possibility of increasing efficiencies at the Ross complex by utilizing existing assets while also leveraging underutilized assets elsewhere in the BPA system.

An underlying basis for all Ross logistics reorganization options is to generally push the logistics footprint – in particular the more active facilities – to the northeast portion of the Ross Complex. The “Recommended Option” centralizes all logistic functions to the northeast corner of the Ross Complex.  The Starr Complex (The Dalles, OR), Nekipe MHQ (Pasco, WA) and Bell MHQ (Spokane, WA) are analyzed as possible new logistics sites as part of the study.

Stats

  • Completion: 2017
  • Construction Cost: $28 Million
  • Project Size: 104,607 sf
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan

Stats

  • Completion: 2017
  • Construction Cost: $28 Million
  • Project Size: 104,607 sf
 
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan
  • Starr Complex Strategic Framework Plan